Skip to content

    Moving Estimate Types for Small Movers: What the Federal Rules Say

    How the estimate types differ, what the federal rules for interstate moves actually say about the written estimate and the survey behind it, and where a video walkthrough fits.

    This is a plain reading of the rule text, not legal advice. The federal rules quoted here cover interstate household goods moves; local and in-state moves follow your state’s rules, so check those before you rely on anything below for a local job.

    By Published Updated 8 min read

    Why rough estimates burn movers

    A common way an estimate goes bad: a number given over the phone or from a quick look, that turns out wrong once the truck is loaded. The customer feels bait-and-switched. The mover either eats the difference or argues about it on moving day, the worst time for either side to be talking price.

    For interstate moves, the written estimate and the survey behind it are set by federal rule, in 49 CFR Part 375. The rule does not tell you which estimate type to use. It tells you that the estimate has to be in writing, built on a survey of the goods, and signed before the move. The sections below quote it.

    The estimate types, plainly

    An estimate can be written several ways, and the difference matters more than most movers price for:

    • The price can still move on moving day, based on actual weight or hours. Flexible, and where many disputes start.
    • One number for the quantities and services written on the estimate. Clear for the customer, but risky for you if the inventory behind it was wrong, because you eat the gap. If the customer adds goods, the federal rule says what you must do before loading: reaffirm it, write a new one, or agree in writing to treat it as one whose price can change.
    • Hourly, flat, or a range, which is how plenty of local work gets quoted.

    For interstate moves the rule recognizes two kinds, one where the final charge follows actual weight and services, and one number for the quantities and services shown, and asks you to say on the estimate which it is. Within that, you quote however you want to quote, and the same company will reasonably use different types for a studio apartment and a packed-out four-bedroom. What decides whether any of them holds up is whether the inventory behind the number is accurate, and that depends on how the survey was done.

    What the federal rules say

    These are the main points of 49 CFR 375 that bear on the estimate, with the section each one comes from. Rule text read November 22, 2026; the full text is linked under Sources.

    • Written estimate375.401(b)

      Before the bill of lading is signed, the mover gives the customer a written estimate of the total charges and says which kind of estimate it is.

    • Survey first375.401(a)

      The written estimate is based on a physical survey of the household goods.

    • On-site or virtual375.103

      A physical survey is one "conducted on-site or virtually." A virtual survey must let the mover view the goods through live or pre-recorded video that clearly identifies them.

    • The waiver375.401(a)

      The customer may waive the survey. The waiver is in writing, signed by the customer before the shipment is loaded, and kept with the bill of lading.

    • Signatures375.401(h)

      The mover and the customer both sign the estimate, and the customer gets a dated copy.

    • Goods added375.403(a)(6)

      If the customer adds goods to a one-number estimate, the mover need not honor it as written. If it takes the shipment, before loading it must do one of three things: reaffirm it, write a new one listing the added goods that the customer signs, or agree in writing to treat it as an estimate whose price can change.

    What the rule does not do: it does not name a set of numbered line items every estimate must cite, and it does not require the survey to happen in person. Which charges you list, and their item numbers, come from the tariff you publish under.

    Show how the number was built

    A total with nothing under it is hard to explain when a customer questions the bill. An estimate that shows its lines is easier to stand behind: for a long distance move that usually means the transportation charge, a fuel charge, packing labor and materials, access charges such as stairs or a long carry, and the valuation the customer picked. Use the names and item numbers of your own tariff.

    The MoveBlueprint Smart Quote Form builds its long distance price range the same way, from separate lines priced at the rates you enter, so the customer sees a range from your own rates rather than a market average. Every range is an estimate; the written estimate for the job is still yours to send.

    Estimates without an in-home visit

    The federal rule asks for a physical survey before the written estimate, and then defines a physical survey as one “conducted on-site or virtually.” For a virtual survey, the mover has to be able to see the goods through live or pre-recorded video that lets it clearly identify what is being moved (49 CFR 375.103). The customer can also waive the survey in writing, signed before loading (49 CFR 375.401).

    So the question for a video survey is a practical one: did the video show you enough to clearly identify the goods? A walkthrough that skips the garage or the attic does not. That judgment sits with you as the carrier, the same way it does after an estimator’s visit.

    The MoveBlueprint AI video survey supports both kinds the rule names: the customer films the home once, talking as they go, or walks it with you on a live video call. The AI recognizes the items, weight and box counts come from standard tables, and you review the inventory and the video before you write the estimate. For how to set up the filming, see how to film a moving walkthrough; for quoting without the drive, the virtual moving quote guide.

    Getting paid what you quoted

    A clear written estimate settles how the number was reached. The other half is collection: a deposit taken before the move, not chased after it.

    With MoveBlueprint, the customer sees a price range from your own rates on your website and can book a date there: a hold goes on their card for your deposit, and the card is charged only when you confirm, two taps, Confirm then Charge, straight to your own account. MoveBlueprint never holds the money. The walkthrough gives you the inventory to write the real estimate the same day, and the lead and the inventory go into any CRM: we build the connection when you sign up, at no charge.

    Want to see it? Book a demo or read the moving estimate software comparison.

    The inventory behind the estimate.

    MoveBlueprint puts a Smart Quote Form on your website and turns the customer’s own walkthrough video into an inventory. The customer films their home once, talking as they go. The AI recognizes what is in each room and works out weight and box counts from standard tables, with room-by-room notes. The inventory lands in any CRM, and you quote from a real inventory the same day, before the other guy calls back. The Smart Quote Form is free; booking and the walkthrough are $199 a month, walkthroughs unmetered. MoveBlueprint does not perform or arrange moves.

    FAQ

    What are the moving estimate types, in plain English?

    An estimate can be written so the price can still move on moving day, or as one number for the quantities and services written on it, or as an hourly rate, a flat price, or a range. Each one shifts risk differently. What matters to a customer is one question: can this number go up, and under what conditions. What matters to a mover is that whichever type is chosen was built on a real inventory rather than a guess over the phone.

    Which estimate type should I actually quote?

    Whichever one fits the job. A mover quotes however they want to quote, and the same company will reasonably use different types for a studio apartment, a long-haul household move, and a packed-out four-bedroom. The thing that goes wrong is not the type chosen, it is quoting any type off a rough guess. Price the real inventory first.

    What do the federal rules require of a written moving estimate?

    For interstate household goods moves, 49 CFR 375.401 asks the mover to give the customer a written estimate of the total charges before the bill of lading is signed, to say which kind of estimate it is, to base it on a physical survey of the goods unless the customer waives the survey in writing, and to have both sides sign it, with a dated copy for the customer (rule text read November 22, 2026). Local and in-state moves follow state rules.

    Do the federal rules list tariff item numbers an estimate must cite?

    No. 49 CFR Part 375 does not name numbered line items. Which charges you list on an estimate, and their item numbers, come from the tariff you publish under. Showing the lines (transportation, fuel, packing, access charges, valuation) still makes a number easier to explain to a customer.

    Can the survey be done by video instead of an in-home visit?

    The federal rule defines a physical survey as one "conducted on-site or virtually," and a virtual survey must let the mover view the goods through live or pre-recorded video that clearly identifies them (49 CFR 375.103, read November 22, 2026). Whether a given video showed you enough is your call as the carrier. MoveBlueprint supports both kinds: a walkthrough the customer films, and a live video call with you.

    How do I get paid what I quoted?

    Two things close that gap: a written estimate built on a reviewed inventory, so there is no doubt about how the number was reached, and a deposit taken before the move rather than chased after it. With MoveBlueprint, the customer can book from the Smart Quote Form on your website: a hold goes on their card for your deposit, charged only when you confirm, straight to your own account.

    Sources

    • 49 CFR 375.103, definition of physical survey: eCFR (read November 22, 2026).
    • 49 CFR 375.401, the written estimate, the survey and the waiver: eCFR (read November 22, 2026).
    • 49 CFR 375.403, redoing the estimate when goods are added: eCFR (read November 22, 2026).
    Related reading

    Updated November 2026.